United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in West Virginia (2010 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| New Creek Mountain Energy Storage Battery storage |
32.0 MW | Withdrawn / abandoned |
| Hydro project W2-005, Taylor County Hydro |
30.0 MW | Withdrawn / abandoned |
| Onshore wind project W4-007, Preston County Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Other project V4-059, Mingo County Other |
20.0 MW | Withdrawn / abandoned |
| Other project W3-161, Fayette County Other |
13.0 MW | Withdrawn / abandoned |
| Hydro project W1-080, Braxton County Hydro |
9.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)