Completed queue projects in West Virginia (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3135 MW
Active in queue1,505 MW4 requests
Agreement signed45.0 MW1 requests
Withdrawn5808 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Black Rock Wind
Onshore wind
110 MWOperating Mineral, WVPJM Mar 20182021
Capon Bridge Solar
Solar
20.0 MWOperating Hampshire, WVPJM Sep 20182024
Beech Ridge Wind Farm
Onshore wind
5.0 MWOperating Greenbrier, WVPJM Aug 20182020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)