United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Washington (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project CS25-14, Adams County Solar + storage |
199 MW | Withdrawn / abandoned |
| Solar + storage project CS25-12, Garfield County Solar + storage |
160 MW | Withdrawn / abandoned |
| Solar + storage project CS25-10, Spokane County Solar + storage |
150 MW | Withdrawn / abandoned |
| Solar + storage project CS25-13, Adams County Solar + storage |
150 MW | Withdrawn / abandoned |
| Onshore wind project CS25-16, Adams County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project CS25-02, Adams County Onshore wind |
126 MW | Withdrawn / abandoned |
| Onshore wind project CS25-01, Spokane County Onshore wind |
120 MW | Withdrawn / abandoned |
| Solar + storage project CS25-06, Grant County Solar + storage |
54.0 MW | Withdrawn / abandoned |
| Solar project CS25-18, Spokane County Solar |
5.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)