United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Washington (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,535 MW
Active in queue210 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn61,535 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project G0556, Klickitat County
Battery storage
1,200 MWWithdrawn / abandoned Klickitat, WAWest Dec 2016target 2026
Onshore wind project G0555, Pacific County
Onshore wind
107 MWWithdrawn / abandoned Pacific, WAWest Oct 2016target 2019
Onshore wind project 48, Adams County
Onshore wind
100 MWWithdrawn / abandoned Adams, WAWest Jan 2016target 2016
Onshore wind project G0552, Pacific County
Onshore wind
80.0 MWWithdrawn / abandoned Pacific, WAWest Aug 2016target 2019
Solar project 749, Walla Walla County
Solar
40.0 MWWithdrawn / abandoned Walla Walla, WAWest May 2016target 2018
Solar project 769, Walla Walla County
Solar
8.0 MWWithdrawn / abandoned Walla Walla, WAWest Jul 2016target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)