Completed queue projects in Washington (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown241.0 MW
Active in queue340 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn314,463 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Grays Harbor Project
Other Β· Grays Harbor Energy LLC
39.0 MWOperating Grays Harbor, WAWest Apr 2019target 2020
Decatur Island Battery Storage
Battery storage
2.0 MWOperating San Juan, WAWest Nov 2019target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)