United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Washington (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4204 MW
Active in queue1,328 MW7 requests
Agreement signed220 MW2 requests
Withdrawn151,569 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Goose Prairie Solar
Solar + storage Β· Goose Prairie Solar LLC
160 MWOperating Yakima, WAWest Nov 2017target 2022
Onshore wind project 856, Columbia County
Onshore wind Β· PacifiCorp Energy Supply Management
23.4 MWOperating Columbia, WAWest Mar 2017target 2019
Solar project 53, Adams County
Solar
19.2 MWOperating Adams, WAWest Apr 2017target 2018
Ross MHQ Solar Project
Solar
1.0 MWOperating Clark, WAWest Jul 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)