United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Washington (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Goose Prairie Solar Solar + storage Β· Goose Prairie Solar LLC |
160 MW | |
| Onshore wind project 856, Columbia County Onshore wind Β· PacifiCorp Energy Supply Management |
23.4 MW | |
| Solar project 53, Adams County Solar |
19.2 MW | |
| Ross MHQ Solar Project Solar |
1.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)