United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Washington (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown488.0 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn151,912 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Lund Hill
Solar Β· Pacific Wind Development, LLC
60.0 MWOperating Klickitat, WAWest Apr 2010target 2020
Nippon Biomass
Other
20.0 MWOperating Clallam, WAWest Apr 2010target 2012
Coastal Energy Project
Onshore wind Β· Coastal Energy Project, LLC
6.0 MWOperating Grays Harbor, WAWest Feb 2010target 2010
Esquatzel Project
Hydro Β· Green Energy Today, LLC
2.0 MWOperating Franklin, WAWest Nov 2010target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)