United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Vermont (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4240 MW
Active in queue38.6 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn4240 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
115 MWWithdrawn / abandoned Windsor, VTISO-NE Apr 2024target 2028
Battery Storage
Battery storage
101 MWWithdrawn / abandoned Windham, VTISO-NE Jun 2024target 2027
Battery Storage
Battery storage
16.0 MWWithdrawn / abandoned Chittenden, VTISO-NE Aug 2024target 2026
Solar
Solar
8.1 MWWithdrawn / abandoned Windham, VTISO-NE Jun 2024target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)