Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4497 MW
Active in queue497 MW4 requests
Agreement signed100 MW1 requests
Withdrawn598,323 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project Q86, Millard County
Onshore wind Β· Intermountain Power Agency
300 MWIn study Millard, UTWest Nov 2021target 2025
Onshore wind project 786, Summit County
Onshore wind Β· Echo Divide Wind, LLC
100 MWAgreement signed Summit, UTWest Aug 2016target 2027
Onshore wind project BPA, Box Elder County
Onshore wind
95.0 MWIn study Box Elder, UTWest Aug 2009
Onshore wind project C1-58, Salt Lake County
Onshore wind
2.0 MWIn study Salt Lake, UTWest May 2021target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)