πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Utah (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown483.7 MW
Active in queue1,138 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn18510 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 641, Washington County
Solar Β· Cove Mountain Solar, LLC
58.0 MWOperating Washington, UTWest Feb 2015target 2020
Solar project 684, Millard County
Solar Β· Pavant Solar III, LLC
20.0 MWOperating Millard, UTWest Jul 2015target 2016
Gas project 657, Salt Lake County
Gas Β· VA Salt Lake City Health Care System
3.7 MWOperating Salt Lake, UTWest Apr 2015target 2016
Solar project 639, Tooele County
Solar Β· Dugway Proving Ground
2.0 MWOperating Tooele, UTWest Jan 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)