Completed queue projects in Utah (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown383.4 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn271,818 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 324, Iron County
Solar Β· Utah Red Hills Renewable Park, LLC
80.0 MWOperating Iron, UTWest Mar 2010target 2015
Other project 333, Beaver County
Other Β· Blue Mountain Biogas, LLC
3.2 MWOperating Beaver, UTWest May 2010target 2012
Hydro project 348, Salt Lake County
Hydro Β· Cottonwood Hydro, LLC
0.2 MWOperating Salt Lake, UTWest Aug 2010target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)