Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Vaquero 1 Wind Onshore wind Β· Enerverse |
400 MW | In study |
| Canyon Wind Onshore wind Β· Canyon Wind Energy, LLC |
309 MW | Agreement signed |
| Armstrong Wind Onshore wind Β· Big Sky Energy |
253 MW | Paused / redesign |
| Tri-X Solar 1 SLF Solar + storage Β· Crane I Solar Electric, LLC |
202 MW | Agreement signed |
| Monte Alto 2 Wind Onshore wind Β· Terra-Gen |
200 MW | Agreement signed |
| Maryneal Wind Onshore wind Β· Maryneal Windpower, LLC |
182 MW | Agreement signed |
| Tri-County Solar Solar |
178 MW | Paused / redesign |
| Grandfalls Solar Solar + storage Β· Nextera |
176 MW | Agreement signed |
| Monte Alto I Onshore wind Β· Terra-Gen |
142 MW | Agreement signed |
| Holstein 2 Solar Solar + storage Β· 229HD 8me LLC |
101 MW | In study |
| Horse13 CallD repower Onshore wind Β· Nextera |
44.0 MW | Agreement signed |
| HHGT repower Horse13+CallD Onshore wind Β· Nextera |
44.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)