Queue requests in study in Texas (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4932 MW
Active in queue2,229 MW12 requests
Agreement signed1,297 MW8 requests
Withdrawn356,196 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Vaquero 1 Wind
Onshore wind Β· Enerverse
400 MWIn study Zapata, TXERCOT Apr 2016target 2027
Armstrong Wind
Onshore wind Β· Big Sky Energy
253 MWPaused / redesign Armstrong, TXERCOT May 2016target 2020
Tri-County Solar
Solar
178 MWPaused / redesign Crane, TXERCOT Oct 2016
Holstein 2 Solar
Solar + storage Β· 229HD 8me LLC
101 MWIn study Nolan, TXERCOT Dec 2016target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)