United States β€Ί Grid β€Ί Interconnection queues β€Ί Tennessee

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Tennessee (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3303 MW
Active in queue303 MW3 requests
Agreement signed303 MW3 requests
Withdrawn162,220 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 445, Moore County
Solar
200 MWAgreement signed Moore, TNSoutheast Jun 2020target 2025
Gas project 426, Humphreys County
Gas
81.0 MWAgreement signed Humphreys, TNSoutheast Apr 2020target 2023
Battery storage project 461, Loudon County
Battery storage
22.0 MWAgreement signed Loudon, TNSoutheast Nov 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)