United States β€Ί Grid β€Ί Interconnection queues β€Ί Tennessee

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Tennessee (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4308 MW
Active in queue308 MW4 requests
Agreement signed308 MW4 requests
Withdrawn7720 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 305, Fayette County
Solar
147 MWAgreement signed Fayette, TNSoutheast Nov 2016target 2026
Solar project 292, Lake County
Solar
80.0 MWAgreement signed Lake, TNSoutheast Apr 2016target 2023
Solar project 299, Lake County
Solar
67.0 MWAgreement signed Lake, TNSoutheast Jul 2016target 2020
Gas project 304, Shelby County
Gas
14.0 MWAgreement signed Shelby, TNSoutheast Nov 2016target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)