Withdrawn queue requests in Tennessee (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown72,311 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn72,311 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 267, Davidson County
Gas
1,220 MWWithdrawn / abandoned Davidson, TNSoutheast Apr 2015
Gas project 266, Davidson County
Gas
940 MWWithdrawn / abandoned Davidson, TNSoutheast Apr 2015
Onshore wind project 272, Cumberland County
Onshore wind
71.0 MWWithdrawn / abandoned Cumberland, TNSoutheast Sep 2015
Solar project 276, Carroll County
Solar
20.0 MWWithdrawn / abandoned Carroll, TNSoutheast Dec 2015
Solar project 268, Hardeman County
Solar
20.0 MWWithdrawn / abandoned Hardeman, TNSoutheast Apr 2015
Battery storage project 271, Polk County
Battery storage
20.0 MWWithdrawn / abandoned Polk, TNSoutheast Aug 2015
Solar project 270, Crockett County
Solar
20.0 MWWithdrawn / abandoned Crockett, TNSoutheast May 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)