United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in South Carolina (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4449 MW
Active in queue449 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn232,056 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 171, Williamsburg County
Solar
249 MWUnder construction Williamsburg, SCSoutheast Oct 2021target 2028
Solar project 167, Darlington County
Solar
75.0 MWPaused / redesign Darlington, SCSoutheast Oct 2021target 2025
Solar project 925531, Williamsburg County
Solar
74.9 MWUnder construction Williamsburg, SCSoutheast Jun 2021target 2026
Solar project 165, Georgetown County
Solar
50.0 MWUnder construction Georgetown, SCSoutheast Oct 2021target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)