United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in South Carolina (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown161,119 MW
Active in queue349 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn161,119 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

16 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 131, Laurens County
Solar
160 MWWithdrawn / abandoned Laurens, SCSoutheast Jul 2019target 2022
Solar project 122, Aiken County
Solar
103 MWWithdrawn / abandoned Aiken, SCSoutheast Feb 2019target 2025
Solar project 126, Berkeley County
Solar
100 MWWithdrawn / abandoned Berkeley, SCSoutheast Jul 2019target 2020
Solar project 125, Berkeley County
Solar
100 MWWithdrawn / abandoned Berkeley, SCSoutheast Mar 2019target 2020
Solar project 123, Aiken County
Solar
81.6 MWWithdrawn / abandoned Aiken, SCSoutheast Feb 2019target 2021
Solar project 133, Dorchester County
Solar
75.0 MWWithdrawn / abandoned Dorchester, SCSoutheast Dec 2019target 2022
Solar project 136, Georgetown County
Solar
75.0 MWWithdrawn / abandoned Georgetown, SCSoutheast Dec 2019target 2022
Solar project 127, Clarendon County
Solar
75.0 MWWithdrawn / abandoned Clarendon, SCSoutheast Jul 2019target 2021
Solar project 134, Orangeburg County
Solar
75.0 MWWithdrawn / abandoned Orangeburg, SCSoutheast Dec 2019target 2026
Solar project 128, Sumter County
Solar
74.9 MWWithdrawn / abandoned Sumter, SCSoutheast Jul 2019target 2025
Solar project 129, Aiken County
Solar
60.0 MWWithdrawn / abandoned Aiken, SCSoutheast Jul 2019target 2021
Solar project 62472, Greenwood County
Solar
55.0 MWWithdrawn / abandoned Greenwood, SCSoutheast Mar 2019
Solar project 63666, Laurens County
Solar
55.0 MWWithdrawn / abandoned Laurens, SCSoutheast Feb 2019
Solar project 121, Marlboro County
Solar
19.9 MWWithdrawn / abandoned Marlboro, SCSoutheast Feb 2019
Solar project 31552, Horry County
Solar
7.6 MWWithdrawn / abandoned Horry, SCSoutheast Mar 2019
Solar project 25592, Lee County
Solar
2.0 MWWithdrawn / abandoned Lee, SCSoutheast Jan 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)