United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in South Carolina (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6364 MW
Active in queue1,013 MW16 requests
Agreement signed578 MW9 requests
Withdrawn436,010 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 566724, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Jun 2022target 2026
Solar project 566488, Chesterfield County
Solar
74.9 MWUnder construction Chesterfield, SCSoutheast Jun 2022target 2027
Solar project 566542, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Jun 2022target 2028
Solar project 566518, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Jun 2022target 2028
Solar project 566580, Lee County
Solar
60.0 MWUnder construction Lee, SCSoutheast Jun 2022target 2028
Battery storage project 561350, Fairfield County
Battery storage
4.6 MWUnder construction Fairfield, SCSoutheast Jun 2022target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)