πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Rhode Island

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Rhode Island (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6376 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn6376 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
180 MWWithdrawn / abandoned Washington, RIISO-NE Apr 2019target 2023
Offshore Wind Increase (Q781)
Offshore wind
167 MWWithdrawn / abandoned RIISO-NE Sep 2019target 2023
Solar
Solar
9.8 MWWithdrawn / abandoned Kent, RIISO-NE Feb 2019target 2021
Solar
Solar
6.3 MWWithdrawn / abandoned Providence, RIISO-NE Jan 2019target 2023
Solar
Solar
6.2 MWWithdrawn / abandoned Providence, RIISO-NE Mar 2019target 2025
Solar
Solar
6.2 MWWithdrawn / abandoned Providence, RIISO-NE Mar 2019target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)