πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Rhode Island

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Rhode Island (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2312 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn29231 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Tiverton Uprate
Gas
306 MWOperating Newport, RIISO-NE Mar 2020target 2021
Chase Hill Substation - NG Western RI DG Area Study
Solar
6.8 MWOperating Washington, RIISO-NE Mar 2020target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)