United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in Pennsylvania (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Mineral Basin Solar Power Solar Β· Mineral Basin Solar Power, LLC |
402 MW | In study |
| Norwegian Solar Solar |
19.8 MW | Paused / redesign |
| Solar project AF2-294, Wayne County Solar |
17.0 MW | Paused / redesign |
| Stony Creek Solar Solar |
15.0 MW | Paused / redesign |
| Morgan Street-Cochranton 34.5 kV Solar |
15.0 MW | Paused / redesign |
| Furnace View Farms Solar |
5.0 MW | Paused / redesign |
| Greenfield CSG 1 Solar |
4.0 MW | Paused / redesign |
| Springfield CSG 1 Solar |
3.9 MW | Paused / redesign |
| Great Lake Growers Solar |
2.6 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)