Queue requests in study in Pennsylvania (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9484 MW
Active in queue1,339 MW36 requests
Agreement signed855 MW27 requests
Withdrawn2466,662 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Mineral Basin Solar Power
Solar Β· Mineral Basin Solar Power, LLC
402 MWIn study Clearfield, PANYISO Aug 2020target 2028
Norwegian Solar
Solar
19.8 MWPaused / redesign Northumberland, PAPJM Apr 2020target 2024
Solar project AF2-294, Wayne County
Solar
17.0 MWPaused / redesign Wayne, PAPJM Mar 2020target 2025
Stony Creek Solar
Solar
15.0 MWPaused / redesign Somerset, PAPJM Mar 2020target 2025
Morgan Street-Cochranton 34.5 kV
Solar
15.0 MWPaused / redesign Crawford, PAPJM Sep 2020target 2026
Furnace View Farms
Solar
5.0 MWPaused / redesign Berks, PAPJM Sep 2020target 2023
Greenfield CSG 1
Solar
4.0 MWPaused / redesign Erie, PAPJM Sep 2020target 2025
Springfield CSG 1
Solar
3.9 MWPaused / redesign Delaware, PAPJM Sep 2020target 2024
Great Lake Growers
Solar
2.6 MWPaused / redesign Erie, PAPJM Sep 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)