πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Pennsylvania (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown560.8 MW
Active in queue1,339 MW36 requests
Agreement signed855 MW27 requests
Withdrawn2466,662 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Smith-Francis Junction 25 kV
Solar
20.0 MWOperating Washington, PAPJM Oct 20202025
Cardinal Solar
Solar
18.9 MWOperating Venango, PAPJM Mar 20202025
Cobalt Solar
Solar
18.9 MWOperating Clarion, PAPJM Mar 20202025
Wyalusing 34.5 kV
Gas
1.5 MWOperating Bradford, PAPJM Mar 20202021
Oxbow Creek Energy
Gas
1.5 MWOperating Wyoming, PAPJM Mar 20202021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)