| Project | Capacity | Status |
|---|---|---|
| Hilltop Energy Center Facility Gas |
130 MW | |
| Lower Mount Bethel Gas |
86.6 MW | |
| Adams Solar LLC Solar |
80.0 MW | |
| Great Cover Solar LLC Solar |
70.0 MW | |
| Phillips Island CT1, CT2, CT3, and ST4 Gas |
67.0 MW | |
| Freedom Generation Plant Gas |
65.0 MW | |
| Solar project AD1-061, Franklin County Solar |
20.0 MW | |
| Upton Solar Solar |
15.0 MW | |
| Gaucho Solar Solar |
11.7 MW | |
| Gaucho Solar Solar |
8.3 MW | |
| Roundtop Energy Projects Gas |
1.5 MW | |
| Beaver Dam Generating Station Gas |
1.5 MW | |
| Glory Barn Road Generating Facility Alpaca Gas |
1.1 MW | |
| Milan Energy Gas |
1.1 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)