United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Pennsylvania (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown14559 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn153,305 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hilltop Energy Center Facility
Gas
130 MWOperating Greene, PAPJM Mar 20172021
Lower Mount Bethel
Gas
86.6 MWOperating Northampton, PAPJM Jul 20172019
Adams Solar LLC
Solar
80.0 MWOperating Adams, PAPJM Jun 20172024
Great Cover Solar LLC
Solar
70.0 MWOperating Fulton, PAPJM Nov 20172024
Phillips Island CT1, CT2, CT3, and ST4
Gas
67.0 MWOperating Delaware, PAPJM Sep 20172020
Freedom Generation Plant
Gas
65.0 MWOperating Luzerne, PAPJM Mar 20172023
Solar project AD1-061, Franklin County
Solar
20.0 MWOperating Franklin, PAPJM Aug 20172022
Upton Solar
Solar
15.0 MWOperating Franklin, PAPJM Aug 20172020
Gaucho Solar
Solar
11.7 MWOperating Washington, PAPJM Mar 20172023
Gaucho Solar
Solar
8.3 MWOperating Washington, PAPJM Sep 20172023
Roundtop Energy Projects
Gas
1.5 MWOperating Susquehanna, PAPJM Sep 20172018
Beaver Dam Generating Station
Gas
1.5 MWOperating Bradford, PAPJM Sep 20172018
Glory Barn Road Generating Facility Alpaca
Gas
1.1 MWOperating Bradford, PAPJM Sep 20172018
Milan Energy
Gas
1.1 MWOperating Bradford, PAPJM Sep 20172018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)