United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Pennsylvania (2013 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Delta York Gas |
760 MW | |
| Sunbury Generation Facility Gas |
381 MW | |
| Pennsylvania Chemicals Generating Facility Gas |
205 MW | |
| Big Level Wind Farm Onshore wind |
70.0 MW | |
| Milan Energy Gas |
19.9 MW | |
| Beaver Dam Generating Station Gas |
19.9 MW | |
| Glory Barn Road Generating Facility Alpaca Gas |
19.9 MW | |
| Seneca Pumped Storage Generating Station Hydro |
17.0 MW | |
| Green Mountain Battery Battery storage |
10.4 MW | |
| South Bend Generating Station Gas |
10.0 MW | |
| South Bend Generating Station Gas |
6.0 MW | |
| Pioneer Crossing Other |
1.6 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)