πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Pennsylvania (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown359.8 MW
Active in queue390 MW7 requests
Agreement signed59.8 MW3 requests
Withdrawn494,265 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Jackson Center Solar Facility
Solar
20.0 MWAgreement signed Mercer, PAPJM Sep 2018target 2026
Welcome Solar II
Solar + storage
19.9 MWAgreement signed Crawford, PAPJM Sep 2018target 2026
Welcome Solar, LLC
Solar + storage
19.9 MWAgreement signed Mercer, PAPJM Aug 2018target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)