United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Oregon (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5552 MW
Active in queue552 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn671,531 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 687, Klamath County
Battery storage Β· Swan Lake North Hydro, LLC
416 MWIn study Klamath, ORWest Jul 2015target 2031
Solar project G0517, Morrow County
Solar
76.0 MWIn study Morrow, ORWest Nov 2015target 2018
Solar project G0516, Sherman County
Solar
20.0 MWIn study Sherman, ORWest Oct 2015target 2016
Other project G0505, Lincoln County
Other
20.0 MWIn study Lincoln, ORWest Jan 2015target 2017
Solar project G0513, Morrow County
Solar
20.0 MWIn study Morrow, ORWest Sep 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)