| Project | Capacity | Status |
|---|---|---|
| Solar project 729, Lake County Solar Β· Airport Solar, LLC |
47.3 MW | |
| NewSun Riley Project Solar Β· Riley Interconnection LLC |
20.0 MW | |
| NewSun Starvation Solar Project Solar Β· NewSun Energy Transmission Company LLC |
20.0 MW | |
| NewSun Fort Rock Project Solar Β· NewSun Energy Transmission Company LLC |
20.0 MW | |
| Fort Rock II Solar Β· Fort Rock Interconnection II LLC |
20.0 MW | |
| Solar project 519, Baker County Solar Β· Adapture Renewables |
15.0 MW | |
| Solar project 512, Baker County Solar Β· Adapture Renewables |
3.0 MW | |
| Solar project 510, Malheur County Solar Β· Adapture Renewables |
3.0 MW | |
| Solar project 511, Malheur County Solar Β· Adapture Renewables |
3.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)