United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Oregon (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9151 MW
Active in queue1,232 MW10 requests
Agreement signed757 MW3 requests
Withdrawn734,870 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 729, Lake County
Solar Β· Airport Solar, LLC
47.3 MWOperating Lake, ORWest Feb 2016target 2019
NewSun Riley Project
Solar Β· Riley Interconnection LLC
20.0 MWOperating Harney, ORWest Jan 2016target 2018
NewSun Starvation Solar Project
Solar Β· NewSun Energy Transmission Company LLC
20.0 MWOperating Harney, ORWest Jan 2016target 2018
NewSun Fort Rock Project
Solar Β· NewSun Energy Transmission Company LLC
20.0 MWOperating Lake, ORWest Jan 2016target 2019
Fort Rock II
Solar Β· Fort Rock Interconnection II LLC
20.0 MWOperating Lake, ORWest Jan 2016target 2019
Solar project 519, Baker County
Solar Β· Adapture Renewables
15.0 MWOperating Baker, ORWest Oct 2016target 2017
Solar project 512, Baker County
Solar Β· Adapture Renewables
3.0 MWOperating Baker, ORWest Jan 2016target 2016
Solar project 510, Malheur County
Solar Β· Adapture Renewables
3.0 MWOperating Malheur, ORWest Jan 2016target 2016
Solar project 511, Malheur County
Solar Β· Adapture Renewables
3.0 MWOperating Malheur, ORWest Jan 2016target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)