United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Oregon (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11106 MW
Active in queue971 MW8 requests
Agreement signed34.6 MW1 requests
Withdrawn18744 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 12-050, Columbia County
Gas
44.0 MWOperating Columbia, ORWest Feb 2012
Onshore wind project 403, Baker County
Onshore wind
10.0 MWOperating Baker, ORWest Dec 2012target 2017
Onshore wind project 402, Baker County
Onshore wind
10.0 MWOperating Baker, ORWest Dec 2012target 2017
Onshore wind project 401, Baker County
Onshore wind
10.0 MWOperating Baker, ORWest Dec 2012target 2017
Onshore wind project 404, Baker County
Onshore wind
10.0 MWOperating Baker, ORWest Dec 2012target 2017
Onshore wind project 405, Baker County
Onshore wind
10.0 MWOperating Baker, ORWest Dec 2012target 2017
The Dalles Northshore Fishway Project
Hydro
7.0 MWOperating Wasco, ORWest Jul 2012target 2012
G0480 Port of Tillamook Bay Gas Digester Project
Other
2.0 MWOperating Tillamook, ORWest Dec 2012target 2013
Geothermal project 414, Klamath County
Geothermal Β· Oregon Institute of Technology
1.8 MWOperating Klamath, ORWest Mar 2012target 2014
Other project G0470, Yamhill County
Other
1.0 MWOperating Yamhill, ORWest Mar 2012target 2012
Hydro project 413, Jefferson County
Hydro Β· Apple, Inc
0.3 MWOperating Jefferson, ORWest Feb 2012target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)