United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Ohio (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project AH1-690, Lucas County Gas Β· CPV Oregon, LLC |
1,475 MW | Withdrawn / abandoned |
| Solar project AG2-149, Crawford County Solar Β· Wombat Solar LLC |
314 MW | Withdrawn / abandoned |
| Solar project AG2-444, Pickaway County Solar Β· Brook Trout Solar, LLC |
163 MW | Withdrawn / abandoned |
| Solar + storage project AH1-539, Hardin County Solar + storage Β· Riverlake Energy, LLC |
129 MW | Withdrawn / abandoned |
| Solar project AG2-515, Lucas County Solar Β· Starling Solar Project, LLC |
100 MW | Withdrawn / abandoned |
| Battery storage project AG2-148, Wyandot County Battery storage Β· Armadillo Solar LLC |
86.0 MW | Withdrawn / abandoned |
| Solar project AH1-339, Wyandot County Solar Β· River Otter Solar LLC |
80.0 MW | Withdrawn / abandoned |
| Solar project AH1-577, Wayne County Solar Β· Dragonfly Fields Solar Project, LLC |
70.0 MW | Withdrawn / abandoned |
| Gas project AH1-735, Defiance County Gas Β· Richland-Stryker Generation, LLC |
55.0 MW | Withdrawn / abandoned |
| Solar project AG2-063, Clark County Solar Β· TerraForm Twin Creeks Solar, LLC |
54.0 MW | Withdrawn / abandoned |
| Solar project AG2-385, Clark County Solar Β· TerraForm Twin Creeks Solar, LLC |
54.0 MW | Withdrawn / abandoned |
| Solar project AH1-669, Ross County Solar Β· Burley Solar, LLC |
50.0 MW | Withdrawn / abandoned |
| Solar project AG2-564, Crawford County Solar Β· Heartland Solar, LLC |
50.0 MW | Withdrawn / abandoned |
| Battery storage project AH1-578, Wayne County Battery storage Β· Dragonfly Fields Solar Project, LLC |
28.0 MW | Withdrawn / abandoned |
| Solar project AH1-075, Marion County Solar Β· Chestnut Solar, LLC |
24.7 MW | Withdrawn / abandoned |
| Solar project AG2-378, Clark County Solar Β· TerraForm Twin Creeks Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Solar project AG2-589, Meigs County Solar Β· Riverlake Energy, LLC |
20.0 MW | Withdrawn / abandoned |
| Solar project AH1-069, Ashland County Solar Β· JR ME LLC |
17.0 MW | Withdrawn / abandoned |
| Solar project AH1-070, Ashland County Solar Β· JR ME LLC |
17.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)