United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Ohio (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7732 MW
Active in queue1,184 MW11 requests
Agreement signed650 MW4 requests
Withdrawn205,570 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hardin Energy Center β€šΓ„Γ¬ Phase 3
Solar
230 MWOperating Hardin, OHPJM Mar 20182025
Guernsey Power Station
Gas
225 MWOperating Guernsey, OHPJM Mar 20182023
Madison Fields Solar Project
Solar
180 MWOperating Madison, OHPJM Mar 20182024
Fayette Solar
Solar
48.0 MWOperating Fayette, OHPJM Jun 20182025
Hardin Energy Center - Phase 3
Solar
20.0 MWOperating Hardin, OHPJM Sep 20182025
Gavin Unit No. 1
Coal
18.0 MWOperating Gallia, OHPJM Jul 20182025
Gavin Unit No. 2
Coal
11.0 MWOperating Gallia, OHPJM May 20182021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)