United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in North Dakota (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3625 MW
Active in queue2,832 MW9 requests
Agreement signed0.0 MW0 requests
Withdrawn3625 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J3415, Mercer County
Solar
250 MWWithdrawn / abandoned Mercer, NDMISO Mar 2024target 2028
Onshore wind project J3667, Dickey County
Onshore wind
200 MWWithdrawn / abandoned Dickey, NDMISO Apr 2024target 2028
Battery storage project J3266, Sargent County
Battery storage
175 MWWithdrawn / abandoned Sargent, NDMISO Apr 2024target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)