United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in North Carolina (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project Q362, Pinal County Solar + storage |
275 MW | In study |
| Swift Creek Solar Solar + storage |
100 MW | Agreement signed |
| Currituck Solar Solar Β· Currituck Solar, LLC |
80.0 MW | Agreement signed |
| Solar project 126062, Alamance County Solar |
35.0 MW | Agreement signed |
| Lillie Solar Solar |
9.4 MW | Agreement signed |
| NC3 Ahoskie South Solar Project Solar + storage |
5.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1 Β· 275 MW
- PJM (Mid-Atlantic, Midwest)4 Β· 194 MW
- Southeast (non-ISO utilities)1 Β· 35.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)