United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in North Carolina (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6504 MW
Active in queue504 MW6 requests
Agreement signed229 MW5 requests
Withdrawn467,039 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project Q362, Pinal County
Solar + storage
275 MWIn study Pinal, NCWest Sep 2020target 2023
Swift Creek Solar
Solar + storage
100 MWAgreement signed Edgecombe, NCPJM Mar 2020target 2029
Currituck Solar
Solar Β· Currituck Solar, LLC
80.0 MWAgreement signed Currituck, NCPJM Jan 2020target 2031
Solar project 126062, Alamance County
Solar
35.0 MWAgreement signed Alamance, NCSoutheast Mar 2020target 2026
Lillie Solar
Solar
9.4 MWAgreement signed Edgecombe, NCPJM May 2020target 2028
NC3 Ahoskie South Solar Project
Solar + storage
5.0 MWAgreement signed Hertford, NCPJM Jun 2020target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)