United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in North Carolina (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 977563, Rowan County Gas |
703 MW | Withdrawn / abandoned |
| Other project PP00032, Wake County Other |
100 MW | Withdrawn / abandoned |
| Solar project 977268, Bladen County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project 977265, Robeson County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project 977271, Scotland County Solar |
80.0 MW | Withdrawn / abandoned |
| Other project PP999999, Wayne County Other |
72.0 MW | Withdrawn / abandoned |
| Solar project AG2-120, Martin County Solar Β· Wildcat Road Solar, LLC |
21.0 MW | Withdrawn / abandoned |
| Solar project AH1-035, Washington County Solar Β· Park Solar, LLC |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)