United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in North Carolina (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown103,274 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn103,274 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Nuclear project 41400, Wake County
Nuclear Β· Duke Energy Progress, LLC
1,125 MWWithdrawn / abandoned Wake, NCSoutheast Jul 2012
Nuclear project 41638, Anson County
Nuclear Β· Masked
937 MWWithdrawn / abandoned Anson, NCSoutheast Dec 2012
Gas project 41118, Chatham County
Gas Β· Duke Energy Progress, LLC
260 MWWithdrawn / abandoned Chatham, NCSoutheast Jul 2012
Gas project 40614, Chatham County
Gas Β· Duke Energy Progress, LLC
224 MWWithdrawn / abandoned Chatham, NCSoutheast Jul 2012
Gas project 41114, Chatham County
Gas Β· Duke Energy Progress, LLC
224 MWWithdrawn / abandoned Chatham, NCSoutheast Jul 2012
Onshore wind project 8603, Carteret County
Onshore wind Β· Masked
200 MWWithdrawn / abandoned Carteret, NCSoutheast Jan 2012
Onshore wind project Y1-043, Washington County
Onshore wind
150 MWWithdrawn / abandoned Washington, NCPJM Mar 2012target 2015
Onshore wind project 4907, Carteret County
Onshore wind Β· Masked
120 MWWithdrawn / abandoned Carteret, NCSoutheast Dec 2012
Solar project Y1-073, Tyrrell County
Solar
20.0 MWWithdrawn / abandoned Tyrrell, NCPJM Apr 2012target 2016
Solar project Y1-060, Hertford County
Solar
15.0 MWWithdrawn / abandoned Hertford, NCPJM Apr 2012target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)