πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in North Carolina (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3322 MW
Active in queue860 MW12 requests
Agreement signed376 MW5 requests
Withdrawn444,825 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 567168, Mecklenburg County
Battery storage
197 MWIn study Mecklenburg, NCSoutheast Jun 2022target 2029
Battery storage project 563648, Gaston County
Battery storage
115 MWIn study Gaston, NCSoutheast Jun 2022target 2027
Solar + storage project AH2-384, Martin County
Solar + storage
10.0 MWIn study Martin, NCPJM Mar 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)