United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in New York (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6504 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn3745 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Eight Point Wind Energy Center
Onshore wind Β· NextEra Energy Resources, LLC
102 MWOperating NYNYISO Nov 2013
Eight Point Wind Energy Center
Onshore wind Β· NextEra Energy Resources, LLC
102 MWOperating Steuben, NYNYISO Nov 20132021
Arkwright Summit
Onshore wind Β· Arkwright Summit Wind Farm LLC
78.4 MWOperating NYNYISO Nov 2013
Arkwright Summit
Onshore wind Β· Arkwright Summit Wind Farm LLC
78.4 MWOperating Chautauqua, NYNYISO Nov 20132021
Bethlehem Energy Center Uprate
Gas Β· PSEG Power NY
72.0 MWOperating Albany, NYNYISO May 20132019
Bethlehem Energy Center Uprate
Gas Β· PSEG Power NY
72.0 MWOperating NYNYISO May 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)