πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in New Mexico (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,007 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn81,007 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Same as project below
Onshore wind
300 MWWithdrawn / abandoned Socorro, NMWest Apr 2010target 2013
WCoMlu3m0b0uWs Solar Energy
Onshore wind
300 MWWithdrawn / abandoned Valencia, NMWest Apr 2010target 2013
(SolarReserve)
Solar
173 MWWithdrawn / abandoned Luna, NMWest Jul 2010target 2014
Solar Reserve
Solar
169 MWWithdrawn / abandoned Luna, NMWest Jul 2010target 2014
Solar project GEN-2010-058, Chaves County
Solar
20.0 MWWithdrawn / abandoned Chaves, NMSPP Nov 2010target 2011
Solar project GEN-2010-020, Chaves County
Solar
20.0 MWWithdrawn / abandoned Chaves, NMSPP Mar 2010target 2011
Solar project GEN-2010-021, Eddy County
Solar
20.0 MWWithdrawn / abandoned Eddy, NMSPP Mar 2010target 2011
Pajarito Project
Solar Β· enXco Dev. Corp
5.0 MWWithdrawn / abandoned Bernalillo, NMWest Apr 2010target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)