United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in New Jersey (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project AG2-451, Salem County Battery storage Β· Carneys Point Energy Storage, L.L.C. |
240 MW | Withdrawn / abandoned |
| Battery storage project AG2-450, Gloucester County Battery storage Β· Logan Energy Storage, L.L.C. |
219 MW | Withdrawn / abandoned |
| Solar project AG2-627, Gloucester County Solar Β· South Harrison Solar, LLC |
40.0 MW | Withdrawn / abandoned |
| Winslow Landfill Solar Farm Solar Β· Winslow LF Solar Farm, LLC |
29.4 MW | Withdrawn / abandoned |
| Battery storage project AG2-533, Warren County Battery storage Β· AF1327 LLC |
20.0 MW | Withdrawn / abandoned |
| Battery storage project AG2-532, Warren County Battery storage Β· V20 Mansfield LLC |
20.0 MW | Withdrawn / abandoned |
| Battery storage project AG2-535, Warren County Battery storage Β· Mansfield 3 LLC |
20.0 MW | Withdrawn / abandoned |
| Battery storage project AG2-534, Warren County Battery storage Β· Mansfield 3 LLC |
20.0 MW | Withdrawn / abandoned |
| Solar project AH1-274, Gloucester County Solar Β· Vineland Newfield Solar Farm, LLC |
16.7 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)