πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in New Jersey (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9625 MW
Active in queue1,118 MW15 requests
Agreement signed0.0 MW0 requests
Withdrawn9625 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project AG2-451, Salem County
Battery storage Β· Carneys Point Energy Storage, L.L.C.
240 MWWithdrawn / abandoned Salem, NJPJM Mar 2025target 2024
Battery storage project AG2-450, Gloucester County
Battery storage Β· Logan Energy Storage, L.L.C.
219 MWWithdrawn / abandoned Gloucester, NJPJM Mar 2025target 2025
Solar project AG2-627, Gloucester County
Solar Β· South Harrison Solar, LLC
40.0 MWWithdrawn / abandoned Gloucester, NJPJM Mar 2025target 2024
Winslow Landfill Solar Farm
Solar Β· Winslow LF Solar Farm, LLC
29.4 MWWithdrawn / abandoned Camden, NJPJM Mar 2025target 2022
Battery storage project AG2-533, Warren County
Battery storage Β· AF1327 LLC
20.0 MWWithdrawn / abandoned Warren, NJPJM Mar 2025target 2021
Battery storage project AG2-532, Warren County
Battery storage Β· V20 Mansfield LLC
20.0 MWWithdrawn / abandoned Warren, NJPJM Mar 2025target 2022
Battery storage project AG2-535, Warren County
Battery storage Β· Mansfield 3 LLC
20.0 MWWithdrawn / abandoned Warren, NJPJM Mar 2025target 2022
Battery storage project AG2-534, Warren County
Battery storage Β· Mansfield 3 LLC
20.0 MWWithdrawn / abandoned Warren, NJPJM Mar 2025target 2022
Solar project AH1-274, Gloucester County
Solar Β· Vineland Newfield Solar Farm, LLC
16.7 MWWithdrawn / abandoned Gloucester, NJPJM Mar 2025target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)