United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in New Hampshire

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown225.0 MW
Active in queue125 MW3 requests
Agreement signed25.0 MW2 requests
Withdrawn815,904 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Nutes Solar
Solar
20.0 MWAgreement signed Strafford, NHISO-NE May 2021target 2026
Grissom Solar
Solar
5.0 MWAgreement signed Sullivan, NHISO-NE Mar 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)