Interconnection queue in Montana (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3233 MW
Active in queue233 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn2502 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2024-216, Custer County
Onshore wind
225 MWIn study Custer, MTSPP Mar 2025target 2027
Hydro project T2-077, Bighorn County
Hydro
8.0 MWIn study Bighorn, MTWest Sep 2025
Battery storage project G1085, Flathead County
Battery storage
0.3 MWIn study Flathead, MTWest Aug 2025target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)