United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Battery storage interconnection queue in Montana

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,059 MW
Active in queue1,059 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn242,568 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 310, Meagher County
Battery storage
450 MWPaused / redesign Meagher, MTWest Dec 2016target 2023
Battery storage project C002, Meagher County
Battery storage
450 MWPaused / redesign Meagher, MTWest Dec 2016target 2020
Battery storage project 455, Yellowstone County
Battery storage
100 MWIn study Yellowstone, MTWest Jan 2024target 2028
Battery storage project 376, Yellowstone County
Battery storage
58.8 MWPaused / redesign Yellowstone, MTWest May 2020target 2023
Battery storage project G1085, Flathead County
Battery storage
0.3 MWIn study Flathead, MTWest Aug 2025target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)