United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Hydro interconnection queue in Montana

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5737 MW
Active in queue737 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn19729 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project G0566, Lincoln County
Hydro
646 MWIn study Lincoln, MTWest Jun 2017target 2022
Hydro project 437, Cascade County
Hydro
70.0 MWIn study Cascade, MTWest Dec 2022
Hydro project 458, Broadwater County
Hydro
10.4 MWIn study Broadwater, MTWest Apr 2024
Hydro project T2-077, Bighorn County
Hydro
8.0 MWIn study Bighorn, MTWest Sep 2025
Hydro project 457, Lewis And Clark County
Hydro
2.2 MWIn study Lewis And Clark, MTWest Mar 2024target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)