United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Montana (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5286 MW
Active in queue1,914 MW10 requests
Agreement signed0.0 MW0 requests
Withdrawn5286 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project G0720, Powell County
Battery storage
120 MWWithdrawn / abandoned Powell, MTWest Dec 2021target 2024
Battery storage project 415, Yellowstone County
Battery storage
80.0 MWWithdrawn / abandoned Yellowstone, MTWest Sep 2021target 2024
Onshore wind project 409, Stillwater County
Onshore wind
80.0 MWWithdrawn / abandoned Stillwater, MTWest Feb 2021target 2023
Solar project 404, Madison County
Solar
3.0 MWWithdrawn / abandoned Madison, MTWest Feb 2021target 2022
Solar project 400, Madison County
Solar
3.0 MWWithdrawn / abandoned Madison, MTWest Jan 2021target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)