United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Montana (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9867 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn9867 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 176, Meagher County
Battery storage
600 MWWithdrawn / abandoned Meagher, MTWest Dec 2014target 2019
Onshore wind project GI-1403, Roosevelt County
Onshore wind Β· Orion Wind Resources
91.0 MWWithdrawn / abandoned Roosevelt, MTWest Mar 2014target 2016
Wind + storage project 170, Big Horn County
Wind + storage
62.5 MWWithdrawn / abandoned Big Horn, MTWest Jul 2014target 2016
Gas project 173, Lewis And Clark County
Gas
60.0 MWWithdrawn / abandoned Lewis And Clark, MTWest Sep 2014target 2014
Onshore wind project 171, Judith Basin County
Onshore wind
25.0 MWWithdrawn / abandoned Judith Basin, MTWest Jul 2014target 2015
Hydro project 169, Big Horn County
Hydro
10.0 MWWithdrawn / abandoned Big Horn, MTWest Apr 2014target 2017
Hydro project 605, Big Horn County
Hydro
9.2 MWWithdrawn / abandoned Big Horn, MTWest Aug 2014target 2017
Solar project 174, Lewis And Clark County
Solar
6.0 MWWithdrawn / abandoned Lewis And Clark, MTWest Dec 2014target 2015
Solar project 175, Lewis And Clark County
Solar
3.0 MWWithdrawn / abandoned Lewis And Clark, MTWest Dec 2014target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)