Completed queue projects in Montana (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown549.0 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn15641 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 135, Judith Basin County
Onshore wind
16.0 MWOperating Judith Basin, MTWest Mar 20112012
Onshore wind project 139, Golden Valley County
Onshore wind
10.0 MWOperating Golden Valley, MTWest May 20112011
Onshore wind project 134, Teton County
Onshore wind
10.0 MWOperating Teton, MTWest Mar 20112012
Onshore wind project 133, Teton County
Onshore wind
10.0 MWOperating Teton, MTWest Mar 20112012
Stoltze Land and Lumber Project
Other
3.0 MWOperating Flathead, MTWest Dec 2011target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)