Completed queue projects in Montana (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown443.1 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn14819 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 126, Judith Basin County
Onshore wind
24.0 MWOperating Judith Basin, MTWest Oct 20102011
Onshore wind project 118, Golden Valley County
Onshore wind
18.4 MWOperating Golden Valley, MTWest May 20102011
Hydro project 129, Carbon County
Hydro
0.5 MWOperating Carbon, MTWest Dec 20102011
Hydro project 116, Gallatin County
Hydro
0.2 MWOperating Gallatin, MTWest Mar 20102011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)