United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Mississippi (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,680 MW
Active in queue1,680 MW8 requests
Agreement signed290 MW3 requests
Withdrawn243,987 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 569, Lowndes County
Gas
620 MWIn study Lowndes, MSSoutheast Jun 2023target 2026
Solar project IC-1113, Lamar County
Solar
200 MWPaused / redesign Lamar, MSSoutheast Jan 2023target 2027
Battery storage project 600, Clay County
Battery storage
200 MWIn study Clay, MSSoutheast Dec 2023target 2026
Solar project IC-1180, Jones County
Solar
200 MWPaused / redesign Jones, MSSoutheast Oct 2023target 2028
Solar project IC-1146, Stone County
Solar
170 MWPaused / redesign Stone, MSSoutheast Jun 2023target 2029
Solar project IC-1145, Jasper County
Solar
156 MWAgreement signed Jasper, MSSoutheast Jun 2023target 2028
Solar + storage project 530, Pinola County
Solar + storage
90.0 MWAgreement signed Pinola, MSSoutheast Mar 2023target 2028
Solar project IC-1203, Jasper County
Solar
44.0 MWAgreement signed Jasper, MSSoutheast Nov 2023target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)