United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Minnesota (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4550 MW
Active in queue550 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn152,575 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1325, Rock County
Solar
200 MWUnder construction Rock, MNMISO Apr 2019target 2025
Solar project J1221, Wadena County
Solar
150 MWIn study Wadena, MNMISO Apr 2019target 2023
Solar project J1445, Benton County
Solar
100 MWUnder construction Benton, MNMISO Apr 2019target 2025
Solar project J1426, Benton County
Solar
100 MWUnder construction Benton, MNMISO Apr 2019target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)