Completed queue projects in Michigan (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7735 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn162,983 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J392, Otsego County
Gas
421 MWOperating Otsego, MIMISO Sep 20142015
Onshore wind project J327, Huron County
Onshore wind
150 MWOperating Huron, MIMISO Mar 20142018
Onshore wind project J340, Huron County
Onshore wind
100 MWOperating Huron, MIMISO May 20142016
Onshore wind project J354, Huron County
Onshore wind
52.0 MWOperating Huron, MIMISO May 20142018
Watervliet Solar Facility
Solar
4.6 MWOperating Berrien, MIPJM Apr 20142016
Other project J406, Wexford County
Other
4.0 MWOperating Wexford, MIMISO Nov 20142018
Onshore wind project J325, Huron County
Onshore wind
4.0 MWOperating Huron, MIMISO Mar 20142016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)